Cultured marble shower walls & tub surrounds, built for hotel bathrooms.
Brand-compliant shower wall systems for Marriott, Hilton, IHG, Choice, Wyndham, Hyatt, and Best Western properties. Custom-sized to your exact dimensions. 20+ designs - or build your own.
Starting price reflects standard sizing. Final pricing varies by dimensions, finish, and order volume.



14+ Designs. Any Size. Matte or Glossy.
Every set is custom-cut to your bathroom's exact dimensions. Choose from our curated designs spanning textured masonry, contemporary stone, and modern geometric finishes — each available in matte or high-gloss.
| Lead Time | 4-6 Weeks |
| Application | Hotel Shower Surrounds |
| Thickness | 9mm - 12mm Standard |
The look of marble, without the maintenance — or the bill.
Natural marble is beautiful. It's also porous, expensive, prone to staining, and a maintenance headache for housekeeping teams. Cultured marble delivers the same visual presence — engineered as a non-porous surface that resists soap scum, mold, and water damage. The result: a bathroom that looks premium on day one and still looks premium on year ten.
Fraction of the Cost
Natural marble can cost 4–6× more per square foot, before installation. Cultured marble delivers comparable visual impact at a price that works for full-property renovations.
Low Maintenance
Non-porous surface. No sealing required. Standard housekeeping cleaners are all that's needed — no specialty stone care, ever.
Easy to Clean
Soap scum, hard water, and mildew wipe off with a standard bathroom cleaner. No grout lines means no scrubbing, no recoloring, no replacement.
Easy to Install
Each set ships as 3 pre-finished panels (2 side walls + 1 back wall). No tile-by-tile labor, no grouting, no extended downtime per room.
Walk-in showers or tub surrounds — same set, sized to your bathroom.
Whether you're renovating walk-in showers in a select-service property or replacing tile around bathtubs in a full-service hotel, the same cultured marble system works. One supplier, one install process, one consistent finish across every bathroom.
Walk-In Showers
- Full-height panels (typically 84″–96″)
- Optional integrated bench seat
- Built-in shelf niche options
- Linear or center drain configurations
- Frameless glass-door compatible
Tub Surrounds
- Sized for standard 60″ alcove tubs (custom dimensions available)
- Three-wall surround configuration
- Optional shampoo niche
- Compatible with all standard hotel tub specs
- ADA-compliant configurations available on request
A complete shower wall set, sized for your bathroom.
Each cultured marble shower wall set arrives as three pre-finished panels, sized to your bathroom's exact dimensions. No tile, no grout, no cutting required — your install team mounts the panels directly to the substrate.
Back Wall Panel
Full-width back wall, custom-cut to your shower's interior dimension. Available with or without recessed niche cutouts.
Side Wall Panels
Left and right side wall panels, custom-cut to match. Pre-finished edges for clean inside corners.
Optional Add-Ons
Built-in shelf niches, integrated benches, fixture cutouts, custom edge profiles. Specify during quote.
From quote to installed.
A streamlined process built for property managers, GCs, and procurement teams. No surprises, no markups, no delays.
Request a Quote
Send your room count, preferred finishes, and rough dimensions. Our team responds within 24 hours with bulk pricing and confirmed lead time.
Confirm Specs
We finalize panel dimensions, niche placement, edge details, and matte vs. glossy finish per room type. You approve before production starts.
Manufacture
Your panels enter production. Standard lead time is 5 weeks from approved specs. Custom dimensions or unusual finishes may add 1–2 weeks.
Deliver & Install
Crated freight delivered to your property. Each set installs in hours, not days — no tile work, no grouting, no extended room downtime.
Built for the punishment of daily use.
- Material
- Cultured marble — polyester resin reinforced with crushed marble & gel-coat surface
- Set Contents
- 1 back wall + 2 side walls (3 panels total)
- Use Cases
- Walk-in showers or tub surrounds (3-wall configuration)
- Sizing
- Fully customizable — any width, any height, any depth
- Finish Options
- High-gloss or matte — same design, two surface treatments
- Surface Properties
- Non-porous, mold-resistant, soap-scum resistant
- Edge Options
- Square, beveled, bullnose, custom radius
- Niche & Bench
- Optional built-in shower niches and integrated bench seats
- Maintenance
- Standard bathroom cleaners — no sealing, no specialty stone care
- Lead Time
- 5 weeks from approved specs
- Starting Price
- From $199 per set (final price varies by size, finish & volume)
- MOQ
- 20 rooms (smaller orders quoted individually)
- Cost vs. Natural Marble
- Typically 25–35% of comparable natural marble installations
5,000+ installs across 582 hotels.
From limited-service properties to flagship full-service hotels, cultured marble shower walls have replaced tile in renovations across the country — saving install time, reducing maintenance calls, and meeting brand standards.
"We renovated 184 rooms across two properties. The custom sizing meant every bathroom — including the awkward ones — got a clean install without on-site cuts. Housekeeping calls about grout dropped to zero."
"The Calacatta Gold finish read as real stone on our brand audit. At a fraction of natural marble cost, the math worked across the whole property. Maintenance is night and day vs. tile."
"Five-week lead time held. Custom panel sizes for our king and double-queen rooms came correct on the first run. We've reordered four times across different properties."
Most USA hotel and motel owners come to us after wasting weeks chasing multiple vendors, comparing mismatched quotes, and still not knowing if their FF&E solutions will pass brand inspection.
There's a better way.
Tell us about your property and we'll get back to you within 24 hours with real pricing, real specs, and a renovation plan that actually fits your PIP timeline.
When your manager says Hampton Kinetic or Fairfield Inn, we already know what your inspector expects.
Everything ships from one place—no vendor chaos.
We quote every project honestly and transparently.
No last-minute scrambling before your PIP deadline.
Renovations happen—disruptions don’t have to.
They all say the same thing: they wish they'd called sooner.
Request Bulk Quote
Typical response within 24 business hours
Everything you need to know before you order.
Clear answers on sizing, pricing, installation, and timelines — so you can move forward with confidence.